Sign In | Join Free | My himfr.com
Home > Drilling Shale Shaker >

Dual Deck Drilling Shale Shaker

    Buy cheap Dual Deck Drilling Shale Shaker from wholesalers
     
    Buy cheap Dual Deck Drilling Shale Shaker from wholesalers
    • Buy cheap Dual Deck Drilling Shale Shaker from wholesalers
    • Buy cheap Dual Deck Drilling Shale Shaker from wholesalers
    • Buy cheap Dual Deck Drilling Shale Shaker from wholesalers

    Dual Deck Drilling Shale Shaker

    Ask Lasest Price
    Brand Name : Aipu
    Model Number : MG
    Certification : API ISO
    Price : USD11678-14598/Set
    Payment Terms : L/C, T/T
    Supply Ability : 30 sets per month
    Delivery Time : 7 days
    • Product Details
    • Company Profile

    Dual Deck Drilling Shale Shaker

    Tandem Dual Deck Shale Shaker For Drilling Mud Waste And Direction Boring

    Schematic description

    Dual-deck shale shaker, also be called double layer screen shale shaker, is a fitful device on drilling mud management or horizontal boring (horizontal direction drilling). Tandem shale shaker manufactured by aipu solids control have demonstrated higher flow rates with all types of mud than other well known mud shale shakers. The horizontal shaker screens allow longer slurry retention time and provide more volume sq.ft. of screen than traditional shakers.


    tandem dual-deck shale shaker detailtandem shale shaker welding details

    Dual deck shaker is one of type shale shakers. As we know, it has two decks: the top deck use coarse screen and the bottom deck use fine screen. The biggest benefit of use dual deck shale shaker is reduced the number of shakers required on solids control system and can deliver high processing capacities.

    Aipu MG series shale shaker on working



    The tandem shale shaker is to put 2 unit single shale shakers on one skid. Normally these two unit shale shakers are completely same to ensure the easy operation and maintenance in future.


    Advantages of Tandem Shale Shaker

    1. Tandem shale shaker could be used flexibly as per the drilling fluids flow rate. For drilling site, mostly two units shale shakers are needed. Sometimes one shaker is working while the other is stand-by; sometimes both of the two shakers will work at full capacity.
    2. As the tandem shale shakers are mounted on the same one skid. For site installation and dismounting, only need to use a crane to lift the whole skid to put on tank top or take it off from the tank.
    3. Convenient transportation. In designing and manufacturing the mounted skid, with consideration of easily putting on flatbed trailer, the skid is made with container type fixing points.


    MG shale shaker specification

    ModelHunter MG3Hunter MG4Hunter-MGD
    Handling Capacity110 m3/h140 m3​/h140 m3​/h
    Screen Area2.04 m22.73m22.73m2
    Screen Number3 sheets4 sheets4 sheets
    Max. Vibration Strenth7.0 G7.5 G6.0 - 7.0 G
    Deck Angle-1 ~ +5o-1~+5o-1~+5o


    Quality Dual Deck Drilling Shale Shaker for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Shaanxi Aipu Solids Control Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)